8 February 2012
The fence along the river bank has been removed in preparation for connecting our site with the River Wear
The landscaping of the lagoon is progressing well, with the creation of mud islands for nesting birds. To the left of the shot is the area of riverbank that will be breached and flooded.
20 September 2024
15 September 2024
12 September 2024